Paradyne 6800 User Manual
Page 221
COMSPHERE 6800 Series Network Management System
5-60
January 1997
6800-A2-GN22-30
EtherLink II Configuration
•
Installing MS-DOS
•
Installing the GrafPoint X-One software package with EtherLink II card
•
Installing the NMS full-feature workstation application software with
EtherLink II card
•
Network configuration of full-feature workstation
StarLAN 10 NAU Configuration
•
Installing MS-DOS
•
Installing the GrafPoint X-One software package with a StarLAN 10 NAU
•
Installing the NMS full-feature workstation application software with
StarLAN 10 NAU
•
Network configuration of full-feature workstation
Token Ring Configuration
•
Installing MS-DOS
•
Installing the GrafPoint X-One software package with a StarLAN 10 NAU
•
Installing the NMS full-feature workstation application software with
StarLAN 10 NAU
•
Installing the Token Ring software on the full-feature workstation
•
Network configuration of full-feature workstation
Installing MS-DOS
A full-feature workstation requires the MS-DOS Operating System. For workstations supplied by
Paradyne, the workstation software is initially loaded at the factory. You may have to reload this
software because of hard disk failure or system upgrade. When reloading, it is advisable to
reformat the hard disk before installing the software.
To reformat, create a bootable disk by using the format /s command. Then copy the format
command (found on the MS-DOS Operating System disk) onto the bootable disk. Boot the system
from the bootable disk and execute the format command on the hard disk.
Once the hard disk has been reformatted, remove the rebootable disk and locate the three MS-DOS
Version 5.0 disks labeled Setup, Disk 1, and Disk 2.
NOTE
If upgrading a full-feature workstation, you can use MS-DOS 3.30a.
Reformat the disk and load MS-DOS with the command insl/dos.
Use the following procedures to install MS-DOS.
1. Insert the disk labeled 1 of 3 into Drive A and turn on the power to the computer.