beautypg.com

Power cycling the subsystem, Ower, Ycling – Promise Technology 2-Year Extended Warranty for VessR2000 RAID Head User Manual

Page 669: Ubsystem

background image

642

Vess

R2000

Series

Product

Manual

Promise

Technologies

p

ower

C

yCliNg

the

s

ubsysteM

To power cycle a RAID subsystem means to:

• Shut down

Turn off the power

Turn on the power

Restart

Power cycling is sometimes required as a remedial action but only when prompted by a message from software

or when directed by Technical Support.

To power cycle the RAID subsystem:

1. Shut down the subsystem.

When the controllers shut down, your network connection is lost.

2. Manually turn off the system power by pressing the power button of the RAID unit for over five seconds.

3. Wait at least 10 seconds.

4. Manually press the power button of the JBOD units.

5. Manually press the power button of the RAID subsystem.

6. Wait no less than two minutes.

7.

Do one of the following actions:

• Open your browser and log into WebPAM PROe.
• Re-establish your Telnet or SSH connection to the subsystem and open the CLU.

If you cannot log in immediately, wait 30 seconds and try again.

Important

If your RAID subsystem manages JBOD expansion units, always power on the

JBOD expansion units first. Then power on the RAID subsystem.