Power cycling the subsystem, Ower, Ycling – Promise Technology 2-Year Extended Warranty for VessR2000 RAID Head User Manual
Page 669: Ubsystem
![background image](https://www.manualsdir.com/files/879257/content/doc669.png)
642
Vess
R2000
Series
Product
Manual
Promise
Technologies
p
ower
C
yCliNg
the
s
ubsysteM
To power cycle a RAID subsystem means to:
• Shut down
•
Turn off the power
•
Turn on the power
•
Restart
Power cycling is sometimes required as a remedial action but only when prompted by a message from software
or when directed by Technical Support.
To power cycle the RAID subsystem:
1. Shut down the subsystem.
When the controllers shut down, your network connection is lost.
2. Manually turn off the system power by pressing the power button of the RAID unit for over five seconds.
3. Wait at least 10 seconds.
4. Manually press the power button of the JBOD units.
5. Manually press the power button of the RAID subsystem.
6. Wait no less than two minutes.
7.
Do one of the following actions:
• Open your browser and log into WebPAM PROe.
• Re-establish your Telnet or SSH connection to the subsystem and open the CLU.
If you cannot log in immediately, wait 30 seconds and try again.
Important
If your RAID subsystem manages JBOD expansion units, always power on the
JBOD expansion units first. Then power on the RAID subsystem.