Managing background activities, Anaging, Ackground – Promise Technology 2-Year Extended Warranty for VessR2000 RAID Head User Manual
Page 170: Ctivities

143
Product Manual
WebPAM PROe - System Configuration
M
AnAgIng
B
AckgRounD
A
ctIVItIeS
Background activity management includes:
• “Viewing Current Background Activities” on page 144
• “Viewing Scheduled Background Activities” on page 144
• “Adding a Scheduled Background Activity” on page 144
• “Changing a Background Activity Schedule” on page 146
• “Enabling or Disabling a Scheduled Background Activity” on page 147
• “Deleting a Scheduled Background Activity” on page 148
• “Redundancy Check” on page 150
• “Initialization” on page 151
• “Synchronization” on page 156
• “Battery Reconditioning” on page 156
Background activities perform a variety of preventive and remedial functions on your physical drives, disk
arrays, logical drives, and other components.
You can run a background activity immediately or schedule it to run at a later time. Scheduling options are
described below.
Setting options for each activity are listed after the scheduling options. These settings determine how the
background activity affects I/O performance.