beautypg.com

Changing a background activity schedule, Hanging, Ackground – Promise Technology 2-Year Extended Warranty for VessR2000 RAID Head User Manual

Page 173: Ctivity, Chedule

background image

146

Vess R2000 Series Product Manual

Promise Technologies

C

haNgiNg

a

b

aCkgrouNd

a

CtiVity

s

Chedule

To change an existing scheduled background activity:

1. Click the

Administration

tab.

2. Click the

Background Activities

icon.

The list of background appears.

3. Click the

Scheduler

button.

The list of currently scheduled background activities appears.

4. Click the background activity and click the

Settings

button.

5. Make settings changes as required:

• Choose a

Start Time

from the drop-down menus.

The menus have a 24-hour clock.

• Choose a

Recurrence Pattern

option, daily, weekly, or monthly.

For the Daily option, enter an interval in the Every field.
For the Weekly option, enter an interval in the Every field and choose one or more

days of the week.

For the Monthly option, choose the Day of the Month option or the day of the week op-

tion, and choose the day from the drop-down menu.

• Choose a

Start From

date from the drop-down menus.

• Choose an E

nd On

option,

No end date or perpetual.
End after a specific number of activity actions.
Until date from the drop-down menus.

• For

Redundancy Check

, choose,

Auto Fix

option – Attempts to repair the problem when it finds an error. Check to en-

able

Pause on Error

option – The process stops when it finds a non-repairable error.

Check to enable

Select LD

– Check the boxes for the logical drives to run Redundancy Check. Check

at least one logical drive

6. Click the

Save

button.