TeeJet Legacy 6000 CAN Guide User Manual
User guide
Table of contents
Document Outline
- USER GUIDE
- Copyrights
- Trademarks
- Limitation of Liability
- Table of Contents
- System Introduction
- Mid-Tech CAN Bus System Overview
- Typical Legacy 6000 Configurations
- Chapter Notes
- Software Overview
- System Setup
- Console Setup
- Lightbar Setup
- GPS Receiver Setup
- Implement Setup
- Product Control Module (PCM) Setup
- Chapter Notes
- Operation Overview
- Starting a Job
- ARM Launcher
- Performing a Calibration
- Introduction
- The Common Calibration Procedure
- Figure 3-7: Typical Calibration Process
- Distance/Speed Calibration
- Liquid Flow Static Calibration
- Liquid Flow In-Field Calibration
- Granular & Seeder Static Calibration
- Granular & Seeder In-Field Calibration
- Pressure Calibration
- NH3 In-Field Calibration
- Injection Static Calibration
- Prime Injection System
- Reverse Prime Injection System
- Job Report Setup
- ARM Setup
- Product Setup
- Chapter Notes
- Product Application
- Figure 4-1: The ARM Launcher Page
- Real-time pages
- Figure 4-2: Real-time Pages
- Information Pages
- The Map Page
- System, Warning and Error Messages
- Real-time Guidance Operation
- Starting Guidance
- Figure 4-15: Selecting a Guidance Pattern in Real-time
- The Straight-Line Guidance Pattern
- The Headland Guidance Pattern
- Applying Multiple Headland Circuits
- Figure 4-17: Operating in Headland Pattern
- Headland Pattern Example
- The Ignore Headland Guidance Pattern
- Ignore Headland Pattern Example
- The Circle Pivot Pattern
- Figure 4-28: Operating in Circle Pivot Pattern
- Circle Pivot Example
- Marking Point A
- Figure 4-29: Marking Point A in Circle Pivot Pattern
- Figure 4-30: Operating in Circle Pivot Pattern
- Figure 4-31: Completing Headland Circuit in Circle Pivot Pattern
- Figure 4-32: Guiding Along Field Headland
- Figure 4-33: Operating in Circle Pivot Pattern
- Figure 4-34: Completed Field in Circle Pivot Pattern
- Lightbar Curved Guidance Graphics
- Applied Area Detection
- Mapping a Field Boundary
- Mapping Points and Hazards
- Exiting Real-Time Operation
- Lightbar Index
- Data Transfer and Report Generation
- Chapter Notes
- System Tools
- Chapter Notes
- Mapper Introduction
- Starting Mapper
- Figure 6-1: The ARM Launcher Page
- Starting a Job
- Creating a New Job
- To create a new job, press the Create Job button in the Job page (Figure 6-2). This brings up the Create a Job page. There are two methods of creating a job: manually and automatically (Figure 6-3).
- From the Job page (Figure 6-2), select an existing Job by using the up and down arrow keys. An existing Job has an associated file folder located on the PC card. The name of the job folder is the same as the job name.
- Figure 6-2: The Job Page
- Manually Naming a Job
- Mapper Setup
- Mapper Setup
- Road Markers
- Creating Object Name
- Real-time pages
- Mapper Tools
- Exiting Real-Time Operation
- Chapter Notes
- Appendix A - PCM Favorites Settings
- Appendix B - Creating a Calibration Table
- Appendix C - NH3 Application
- Notes