1 automatic system test, 2 test tools – Metrohm 916 Ti-Touch User Manual
Page 150
13.1 Automatic system test
■■■■■■■■■■■■■■■■■■■■■■
134
■■■■■■■■
916 Ti-Touch
[GLP tests HW/SW]
Document the GLP tests "Measurement" and "Titration" (see Chapter
13.3, page 135).
[System validation]
Document the system validation (see Chapter 13.4, page 139).
[Monitoring]
Define time intervals for system maintenance and backups (see Chapter
13.5, page 143).
[View test data]
Display the data of the selected test.
13.1
Automatic system test
The system test is carried out automatically when the Ti-Touch is switched
on. The result of each individual test is shown in green if no error has
occurred. If a result is shown in red, then an error occurred when the
respective test was carried out. Switch the Ti-Touch off and back on
again. If the error still occurs pleased notify Metrohm Service.
Print report at system start
on | off (Default value: off)
If this parameter is activated, then the result of the system test will be
printed out automatically when the Ti-Touch is switched on.
13.2
Test tools
Main dialog: System
▶ GLP manager ▶ Test tools
You can create a list of test tools to be used in the tests in the GLP man-
ager.
The following test tools have already been defined:
■
767 Calibrated Reference: Device for checking measuring inputs
and electrode cable.
■
822 Titr.Curve Simulator: Curve simulator for checking the hard-
ware and software.
■
773 pH/mV Simulator: Device for checking measuring inputs and
electrode cable.
■
868 UR Generator: Device for checking measuring inputs and elec-
trode cable.
[New]
Add a new test tool to the list.