beautypg.com

13 glp manager – Metrohm 916 Ti-Touch User Manual

Page 149

background image

■■■■■■■■■■■■■■■■■■■■■■

13 GLP manager

916 Ti-Touch

■■■■■■■■

133

13 GLP manager

Main dialog: System

GLP manager

In the GLP manager you can document data for various GLP tests. The
results of the automatic system tests carried out after switching on are
also documented.

The following tests can be documented:

GLP test "Measurement" (see Chapter 13.3, page 135)

GLP test "Titration" (see Chapter 13.3, page 135)

System validation (see Chapter 13.4, page 139)

In addition, you can also:

Create a list with your test tools (see Chapter 13.2, page 134).

Define a service interval for having routine maintenance carried out by
a Metrohm service technician (see Chapter 13.5, page 143).

Define an interval for the regular performance of backups (see Chapter
13.5, page 143)
.

Further information about quality management and validation is also given
in the documentation series Quality Management with Metrohm and
Application Bulletin AB 252 (Validation of Metrohm titrators (potentio-
metric) in accordance with GLP/ISO 9001).

The table shows the last time that each test was carried out and when the
next test is to be carried out. A test is entered in the list the first time that
it is documented.

[Test tools]

Configure test tools for GLP tests (see Chapter 13.2, page 134).