beautypg.com

Luminex 100 IS Version 2.2 User Manual

Page 79

background image

x

MAP Technology

Using Luminex 100 IS 2.2 Software

PN 89-00002-00-069 Rev. A

6 - 25

the command process in yellow text below the graphic. For example,
Figure 36 shows the Warmup command graphic.

Figure 36. Processing Device Activity Commands

Table 3 shows a recommended schedule for maintenance operations.

Table 3. Maintenance Operations:

Recommended Use Schedule

Operation

Recommended Use Schedule

Warmup

Daily

After four hours of system inactivity

Prime

Daily

To remove air from sheath fluid tubing

After performing these actions:
– refilling the sheath container
– removing and replacing sheath container
– changing the sheath fluid filter
– changing the syringe seal

Backflush

Troubleshooting purposes only:
– to remove obstructions from the cuvette
– if fluid does not flow through the waste

tubing during prime cycles or during
sample acquisition

– if fluid drips from the Sample Probe during

priming and forms puddles of fluid on the
plate

Alcohol Flush

Daily

After changing the Sample Probe

To remove air bubbles from the cuvette using
70% isopropanol