beautypg.com

Luminex 100 IS Version 2.2 User Manual

Page 49

background image

x

MAP

Technology

System Calibration

PN 89-00002-00-069 Rev. A

5 - 5

Figure 10. Update CON Targets Dialog Box

6. Enter the expiration date.

7. Enter the values, listed in the Certificate of Quality (COQ)

included with your system controls, into the CON2 entry field.

8. Click OK.

9. Ensure that the analyzer is set to draw CON1 and CON2 beads

from the wells you loaded in step 2 of “Run System xMAP
Calibrators” on page 5-2.

10. Click CON1 from the Maintenance tab. A Confirmation Screen

dialog box appears.

11. Click OK and wait until CON1 completes. The Device Status

section in the status bar changes from “Running” to “Standby”.

12. Click CON2 from the Maintenance tab. A Confirmation Screen

dialog box appears.