12 hpal voltage calibration – part v of v, Hpal – AMETEK ReFlex User Manual
Page 317

Active Loads
ReFlex Power™
7-42
M380056-01 Rev J
7.6.12
HPAL
V
OLTAGE
C
ALIBRATION
–
P
ART
V
OF
V
This procedure calibrates the voltage for voltage gain 1 and current range low.
Make sure that the shunt and the DC voltmeter are connected between the
positive and negative lead of the active load. Also connect the sense positive-to-
positive lead and sense negative-to-negative lead.
This procedure requires maximum voltage 500V and maximum current 0.18
Amps.
1. Turn the active load on:
INP
2. Set the conductance count to 0x15D:
CAL
3. Set the input DC voltage to 10 Volts. After the input DC voltage stabilizes
enter the first exact voltage using following command:
CAL
>
4. Set the input DC voltage to 500 Volts. After the input DC voltage
stabilizes enter the second exact voltage using following command:
CAL
5. Send the calibration command to calculate the gain and offset:
CAL
6. Send the system error query command to make sure calibration was
successful:
SYST:ERR?
7. If there is no error returned at the system error query command then save
the calibration result:
CAL
CAL
CAL
8. Reset the unit:
*RST