11 hpal voltage calibration – part iv of v, Hpal – AMETEK ReFlex User Manual
Page 316
ReFlex Power™
Active Loads
M380056-01 Rev J
7-41
7.6.11
HPAL
V
OLTAGE
C
ALIBRATION
–
P
ART
IV
OF
V
This procedure calibrates the voltage for voltage gain 1 and current range high.
Make sure that shunt and the DC voltmeter is connected between the positive
and negative lead of the active load. Also connect the sense positive-to-positive
lead and sense negative-to-negative lead.
This procedure requires maximum voltage 500.0V and maximum current 1.0
Amps
1. Turn the active load on:
INP
2. Set the conductance count to 0x831:
CAL
3. Set the input DC voltage to 10 Volts. After the input DC voltage
stabilizes enter the first exact voltage:
CAL
4. Set the input DC voltage to 500 Volts. After the input DC voltage
stabilizes enter the second exact voltage:
CAL
5. Send the calibration command to calculate the gain and offset:
CAL
6. Send the system error query command to make sure calibration was
successful:
SYST:ERR?
7. If there is no error returned at the system error query command then
save the calibration result as follows:
CAL
CAL
CAL
8. Reset the unit
*RST