Active Loads

ReFlex Power™

7-28

M380056-01 Rev J

7.5.5

I

NITIAL

F

UNCTIONAL

T

ESTS

P

OWER

-O

N

C

HECK

1. Ensure that the AC/DC input service is disconnected.

2. Install the interface cable between the host controller and the ReFlex

Power™ Controller module.

3. Connect an appropriate input source to the Active Load module.

4. Configure the host controller for communications with the ReFlex

Power™ Controller module.

5. Turn on the Mainframe AC/DC input service.

6. The modules will first execute a power-on self-test. Also the internal fans

are run at maximum speed for several seconds, and then back to slow
speed.

7. In the following paragraphs, commands include a channel number, [n].

The channel number corresponds to the slot of the ReFlex Power™
Mainframe where the module is located, counting left to right, 1 through
12. For example:

SOUR[n]:CURR 5 will be
SOUR4:CURR 5 for slot-1
SOUR7:CURR 5 for slot-2

8. Additionally, model specific parameter values must be added for full-scale

voltage and current. They are shown in the following examples as floating
point numerical values, . For the Active Load modules, the values
are as follows:

Full-Scale Current:

HPAL: 30

LPAL: 15

Therefore, for an 750W Active Load module in slot 4, the command for
full-scale current would be SOUR4:CURR 30; for a 375W Active Load
module, it would be SOUR4:CURR 15.

9. Verify communications with the ReFlex Power™ Controller module by

issuing an SCPI *IDN[n]?, where “n” is a channel number that
corresponds to the slot of the ReFlex Power™ Mainframe where the
module is located, counting left to right, 1 through 12.