Metrohm tiamo 1.3 Manual User Manual
Page 385
Commands
359
For a fixed quantity (measured value, volume or time) for the fix end point
the associated values are interpolated from the list of measuring points.
Fixed quantity
[ Measured value ], Time, Volume
Selection of the fixed quantity to which the associated values for the other
quantities are to be interpolated from the list of measured points.
Fix EP# at
-2000.0 ... 2000.0 mV, [ off ]
Fix end point 1 ... 9 for
Fixed quantity
=
Measured value
.
Fix EP# at
0.0 ... 999999.9 s, [ off ]
Fix end point 1 ... 9 for
Fixed quantity
=
Time
.
Fix EP# at
0.00000 ... 9999.99 mL, [ off ]
Fix end point 1 ... 9 for
Fixed quantity
=
Volume
.
With this button additionally to the always shown fix EP1...3 the fix EP4...9
are displayed.
With this button instead of fix EP1...9 only the fix EP1...3 are shown.
pK/HNP evaluation
on, [ off ]
With this evaluation from the titration curve the pK value can be determined
.which corresponds to the pH value at the half neutralization point (see Ti-
tration commands - Evaluation - pK value and half neutralization potential).
Minimum evaluation
on, [ off ]
For the minimum measured value the associated volume, time and tem-
perature are interpolated from the list of measuring points (see Titration
commands - Evaluation - Minimum/maximum evaluation).
Threshold value
0.1 ... [ 25.0 ] ... 2000.0 mV/mL
The evaluation begins as soon as the slope of the curve exceeds the set
threshold value.
Maximum evaluation
on, [ off ]
For the maximum measured value the associated volume, time and tem-
perature are interpolated from the list of measuring points (see see Titration
commands - Evaluation - Minimum/maximum evaluation).
Threshold value
0.1 ... [ 25.0 ] ... 2000.0 mV/mL
The evaluation begins as soon as the slope of the curve exceeds the set
threshold value.
Break point evaluation
on, [ off ]
(only Titrando)
With the break point evaluation sharp changes of direction in the titration
curve are determined (see Titration commands - Evaluation - Breakpoint
evaluation).
EP criterion
0 ... [ 0.3 ] ... 1.0
Measure of the minimum sharpness of the break point. The lower the EP
criterion set, the more break points will be found. As this is a relative value
related to the total measured value alteration, for a small measured value