Metrohm tiamo 1.3 Manual User Manual
Page 142

116
Workplace
6 - Main run
When processing the loaded method the following actions can be carried out:
•
Process main track
After the start of the Main track the status changes to
BUSY
. The commands
of the main track and the other tracks that it calls up are processed in se-
quence. If the main track calls up tracks that are not free then a pause will
be made until these tracks can be started.
•
Interrupt and continue run
A running determination can be interrupted at any time with
[Hold]
and then
continued with
[Cont]
. All the active tracks will be stopped and continued
together.
•
Cancel sequence
A running series can be canceled at any time with
[Stop]
. An Exit track may
be carried out; the determination will be terminated.
•
Cancel by error
If when a determination is being carried out an error occurs that causes the
cancellation of the determination then an Error track may be carried out; the
determination will be terminated.
•
Process exit track
When the main track and all the other tracks that it has called up have been
completed then an Exit track may be carried out; the determination will be
terminated. After the end of the Main track the status changes to
READY
.
7 - Post-conditioning (only for methods with conditioning)
In methods that contain commands with switched-on conditioning and in which
the option
Automatic conditioning
is switched on in the
START
command then for all
these commands post-conditioning will be started automatically with the loaded
method immediately after the end of the track that contains the conditioning
command.
•
Conditioning requirement not fulfilled
After the start of post-conditioning the status changes to
COND BUSY
. In this
status a new determination can be started with
[Start]
, even though the
conditioning requirement has not been fulfilled. Conditioning can also be
canceled with
[Stop]
or interrupted with
[Hold]
and then continued with
[Cont]
. If an error occurs during conditioning then neither the Error track nor
the Exit track will be carried out.
•
Conditioning requirement fulfilled
If the conditioning requirement has been fulfilled then the status changes to
COND READY
. In this status a new determination can be started with
[Start]
.
Conditioning can also be canceled with
[Stop]
or interrupted with
[Hold]
and
then continued with
[Cont]
. The conditioning requirement will continue to be
monitored continuously until the determination has been started.
Device assignment
If at the Start test it is discovered that no device has been assigned for a device-
specific command then the window
Device assignment
appears for assigning the
device: