Part 2 startup chapter – IAI America REXT User Manual
Page 329

0
Part 2 Startup Chapter
Chapter 5 Network Setup
303
Part 2 Startup Chapter
(2) Setting the parameters
[1]
In the project data list, double-click “Network Parameters.” When the network parameter selection dialog box
appears, click the
CC-Link button.
[2]
When the CC-Link network parameter setting screen appears, set “1” under “Number of Units.”
(Master station is set for 1 in this operation.)
-329-