5.1.4 Operating Procedures
(1) Loading the parameters
This tool establishes communication with the Gateway R unit when the parameters are loaded. Accordingly, always load
the parameters if the tool or Gateway R unit has been restarted.
[1]
Click the
Load button. When a message box appears, asking if you want to permit a parameter load, select Yes
to load the parameters.
[2]
When all parameters have been loaded, a message box appears to inform you of the completion of load. Click
OK.
[3]
If the tool has failed to load the parameters, the following message appears.