WattMaster WM-WCC3-TGD-01B User Manual
Page 421

WCCUTILITY.EXE SCREENS
WCC III Technical Guide
5-39
SET GLOBAL MAP VIEW AND BRIDGE MAP
Overview
The “WCC II to WCC III Global Bridge” board provides a means 
for the new WCC III system to pass information to and from the 
old WCC II system. A single “WCC II to WCC III Global Bridge” 
board can simulate (mirror) up to 8 WCC II SAT II Controllers. A 
“WCC II to WCC III Global Bridge” can also share Global Binary 
and Global Analog information from WCC II to WCC III and 
current values of the simulated (mirrored) satellites from WCC III 
to WCC II. But this is a one way data fl ow for the Global data, the 
direction is from the WCC II system to the WCC III system. 
WccUtility.EXE Program Setup
Considerations and Limitations for
Global Bridge
To setup the Global Map for the “WCC II to WCC III Global Bridge”, 
you only have to fi ll out the data in one “SetGlobalMapView” 
window even if you have multiple “WCC II to WCC III Global 
Bridges”. This is because all of the “WCC II to WCC III Global 
Bridges” will have the same global analog/binary value that will 
come from the WCC II front-end computer.
There are no limitations to the number of global analogs or global 
binaries that you can setup from within the “SetGlobalMapView” 
window. Of course, you cannot setup more than the WCC II limi-
tations of 128 global analogs and 256 global binaries.
The BACKTASK.EXE program that is running on the WCC III 
- MCD requires that the WccUtility.exe program be connected 
(via an IP connection) to the WCC III - MCD, that the WccUtility.
exe program be opened and running at all times, and that the 
“SetGlobalMapView” window also be opened at all times. This IP 
connection must be made so that BACKTASK.EXE can fetch and 
retrieve the global values from the “old” WCC II system.
If you close the “SetGlobalMapView” window or the WccUtility.
exe program, the BACKTASK.EXE program will not be able to 
retrieve any global values from the “old” WCC II system. This 
means that the “SetGlobalMapView” window that does the global 
analog and global binaries value transfers will not transfer these 
global analog and global binaries values from the “WCC II to 
WCC III Global Bridge” board to BACKTASK.EXE program of 
WCC III - MCD. 
Set Global Map View and Bridge Map