beautypg.com

Application examples – Lenze 8200 motec frequency inverter 0.25kW-7.5kW User Manual

Page 188

background image

Application examples

Pressure control

13−3

L

EDB82MV752 EN 5.2

Jumper position at application I/O

·

Jumper A in 7−9 position (actual pressure 0 ... 10 V at X3/1U)

·

Remove jumper B (setpoint selection via master current at X3/2I), (observe C0034)

·

Plug jumper C into 3−5 position (actual pressure value is output as current signal to X3/62)

·

Jumper D in 2−4 or 4−6 position since X3/63 is not assigned.

Tip!

·

For this example the controller must be equipped with an application I/O since two analog
inputs are required.

·

If the pressure setpoint is not selected via PLC but via PC, keypad, or fixed setpoint, a
standard I/O is sufficient.