Stake road - screen 4, Road slope staking road slope staking - screen 2 – Spectra Precision Survey Pro v5.0 User Manual
Page 215
button is tapped, the following actions will occur:
1. A new backsight circle value is computed, sent to the instrument and stored in the raw data
2. The Angle Right value is changed to zero to reflect the change. The instrument now needs to be turned
horizontally to zero to face the design point.
3. To prevent errors, the backsight set up is invalidated when exiting the Stakeout dialog if this button has been
used. A Circle zeroed on a design point is meaningless once the design point has been staked.
Note: The [Circle Zero] button is not available when using a robotic total station.
screen.
Stake Road screen where the shots to the stake point are performed.
Stake Road - Screen 4
The fourth and final Stake Road screen is used to perform the shots necessary to locate the design point. This screen is
identical to the final
screen.
Road Slope Staking
[Roads] [Slope Staking]
The Road Slope Staking screen is used to locate the catch point of the road at any station.
[Tap Road…]: opens the Tap on a Road screen where you can tap on any road in the job to select it.
Name: displays the name of the selected road.
Begin Station: displays the station assigned to the beginning of the road.
End Station: displays the final station in the road.
Use Station Equation: When checked, the current station equation will be applied to the road.
[Equation Settings] : opens the
screen where a station equation can be configured.
[Backsight…]: Opens the
Road Slope Staking screen where the slope staking parameters are set up.
Road Slope Staking - Screen 2
The second Road Slope Staking screen is used to set up some slope stake parameters prior to slope staking the road.
Station: is the station to be slope staked.
Station Interval: specifies how far to advance from the current station to the next station.
Survey Pro Help 5.00
215