beautypg.com

Metrohm viva 1.0 Manual User Manual

Page 799

background image

■■■■■■■■■■■■■■■■■■■■■■

7 Devices

viva 1.0

■■■■■■■■

787

Next GLP test

Date on which the next GLP test is to be carried out. The date can be

selected by clicking on

in the Select date dialog window (see Chap-

ter 2.4.1, page 67). After the date has been entered, the GLP test inter-
val
field will be adjusted automatically.

Only editable if monitoring is switched on.
Default value

   GLP test date + 999 days

Message
The message options can only be edited if monitoring is switched on.

Message by e-mail

on | off (Default value: off)

The message is sent to the address defined under [E-mail...] if this check
box is activated. The message is sent in text format.

[E-mail...]

[E-mail...] opens the Send e-mail window (see Chapter 2.5.1, page 69).

Acoustic signal

on | off (Default value: off)

If this check box is activated, an acoustic signal will be emitted in addition
to the message.

Action
The actions can only be edited if monitoring is switched on.

If it is found during monitoring that the validity period has expired, then
one of the following actions will be triggered automatically during the
start test:

Selection

Record message | Display message | Cancel
determination

Default value

Display message

Record message
The message that the validity period has expired will be automatically
saved with the determination.
Display message
A message is displayed and you can select whether you want to con-
tinue the run or cancel it. If the run is continued then the message that
the validity period has expired will be automatically saved with the
determination.