Creating a second monitoring point, Assigning a rain gauge to a monitoring point, Creating a second monitoring point -24 – ADS Environmental Services Profile Software 950015B6 User Manual
Page 64

2-24
Profile Software User's Guide
CONFIDENTIAL – Covered by ADS Software License Agreement
1998 – 2012 ADS LLC. All Rights Reserved.
The new monitor location with a single monitoring point is now
created, configured, and available in the database.
Creating a Second Monitoring Point
Use this option only when you want to create a second monitoring
point for an ADS monitor location. The first monitoring point is
created automatically when a monitor location is created.
Create a second monitoring point in the Profile database for the
currently selected monitor by selecting Edit > New > Monitoring
Point or the New Monitoring Point toolbar button.
1. Select a location from the database.
New
Monitoring
Point
button
2. Select the Edit > New > Monitoring Point option or the New
Monitoring Point toolbar button. This option is only available
when a monitor location is selected.
A second monitoring point now exists for the selected monitor
location.
Assigning a Rain Gauge to a Monitoring Point
Allow Profile to report the corresponding rain data for a monitoring
point by assigning a rain gauge. Perform the following steps to
assign a rain gauge to a monitoring point:
1. Select the monitoring point from the database to which you
want to assign a rain gauge.
Properties
button
2. Select the Edit > Properties option or the Properties toolbar
button.
3.
Complete the Properties for [location name, monitoring
point] dialog in the following way: