beautypg.com

12 glp manager, 1 automatic system test – Metrohm 840 PC Control 5.0 / Touch Control User Manual

Page 99

background image

3

Operation

PC Control / Touch Control

87

3.12 GLP manager

In the GLP manager you can document data for various GLP tests.

The results of the automatic system tests carried out after START are

also documented. You can also draw up a list containing the test tools

which you use and enter a service interval for having routine

maintenance carried out by a Metrohm service technician.
Further information about quality management and validation is also

given in the documentation series Quality Management with

Metrohm and Application Bulletin AB 252 (Validation of Metrohm

titrators (potentiometric) according to GLP/ISO 9001). An example of a

method for carrying out a validation according to AB 252 (Validation

according to AB 252) is stored under Examples (see Section 3.15.1).

Open the dialog System/GLP manager.

The table shows the last time that each test was carried out and when

the next test is to be carried out. A test is entered in the list the first time

that it is documented. The following tests can be documented: a GLP

test for measurement, a GLP test for titration and the system

validation.
You can view the results of the selected test with [View test data].

3.12.1 Automatic system test

The system test is carried out automatically each time that the Touch

Control is switched on or each time that the PC Control software is

started.

Select the line Automatic system test in the table and open the

results page for the test with [View test data].

You can automatically print out the results of the automatic system

test each time that the system starts up by activating the Print

system test report at system start checkbox.