12 glp manager, 1 automatic system test – Metrohm 840 PC Control 5.0 / Touch Control User Manual
Page 99
3
Operation
PC Control / Touch Control
87
3.12 GLP manager
In the GLP manager you can document data for various GLP tests.
The results of the automatic system tests carried out after START are
also documented. You can also draw up a list containing the test tools
which you use and enter a service interval for having routine
maintenance carried out by a Metrohm service technician.
Further information about quality management and validation is also
given in the documentation series Quality Management with
Metrohm and Application Bulletin AB 252 (Validation of Metrohm
titrators (potentiometric) according to GLP/ISO 9001). An example of a
method for carrying out a validation according to AB 252 (Validation
according to AB 252) is stored under Examples (see Section 3.15.1).
Open the dialog System/GLP manager.
The table shows the last time that each test was carried out and when
the next test is to be carried out. A test is entered in the list the first time
that it is documented. The following tests can be documented: a GLP
test for measurement, a GLP test for titration and the system
validation.
You can view the results of the selected test with [View test data].
3.12.1 Automatic system test
The system test is carried out automatically each time that the Touch
Control is switched on or each time that the PC Control software is
started.
Select the line Automatic system test in the table and open the
results page for the test with [View test data].
You can automatically print out the results of the automatic system
test each time that the system starts up by activating the Print
system test report at system start checkbox.