4 system validation – Metrohm 840 PC Control 5.0 / Touch Control User Manual
Page 102
3.12 GLP manager
90
PC Control / Touch Control
Open the dialog GLP test measurement/Test interval or GLP
test titration/Test interval.
Activate the Monitoring checkbox.
Enter either the GLP test interval or the date for the Next GLP
test. If the time interval or date is edited then the other parameter
will be updated automatically.
Select an Action to be carried out when the time interval has
expired.
The GLP test interval will always be monitored at the START of a
determination.
3.12.4 System validation
You can document the System validation results here and also define
the time interval after which validation must be carried out again.
To document the results of a system validation open the dialog GLP
manager/System validation.
You can select or enter the Method used for the system validation.
Only methods in the internal memory will be shown in the selection
list. You can also enter or select the User who carried out the
validation from the selection list.
Enter the Test date for the last validation and select the Test
result.
You can enter a Comment for each test.
Open the dialog System validation/Test statistics. You can
document the statistical data for the last system validation here.
Please consult the online help for a description of the individual
parameters.
You can monitor the time interval after which a system validation
must be carried out again. (A detailed description of the monitoring
function using "Titer validity" as an example can be found in
Section 3.8.4.)
Open the dialog System validation/Validation interval.
Activate the Monitoring checkbox.