beautypg.com

Metrohm 726 Titroprocessor User Manual

Page 48

background image

3.2 Configuration

Configuration of sample changers

726 Titroprocessor, Instructions for use

42

42

3.2.3 Basic configuration of 717 Sample changer

The softkeys [Changer 1] and [Changer 2] open the dialog window
for the definition of the basic configuration of the sample changer.

ЪДДД

Changer 1

ДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДД¿

³ ³

³ Tower 1/2 max. height 235 mm ³

³ ³

³ Tower 1 : 1 Pump[s] ³

³ Swing head no ³

³ ³

³ Tower 2 : 1 Pump[s] ³

³ ³

³ Power-up sequence ³

³ MOVE Beaker 1 to Tower 1 ³

³ Shift direction + ³

³ LIFT on tower 1 to position 0 mm ³

³ LIFT on tower 2 to position 0 mm ³

³ ³

³ Remote Pattern ************** ³

³ ³

АДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДДД QUIT ÄÙ

Lift stations

Tower 1/2

max. height

The maximum height (in mm) of the tower determines the
path which the lift of a tower can move. As the rest

position (0 mm) of the lift is always at the upper stop of a

tower the deepest lift position possible should be entered

here; this ensures that sensors at the lift head are not

damaged by careless lowering of the lift.

Depending on the model version of the sample changer the following

information must be entered correctly:

Tower 1/2

Pump[s]

Number of pumps at the corresponding tower.

Swing head

Presence of a 759 Swing head if multi-row sample racks
are used. A swing head should always be mounted on

tower 1.

Power-up sequence

A sample changer is always initialized on switch-on i.e. the lift stations move

to the rest position (0 mm), the sample turntable rotates to the initial position

so that the rack code can be read.

Under some circumstances it may then be required that other positions are

moved to or that peripheral devices which are connected must be activated.

For this purpose the 726 Titroprocessor offers the possibility of carrying out

a switching-on sequence at the connected sample changers 717 after the

sample changers have been initialized at power-up.