beautypg.com

3 fan bp, Fan bp – FUJITSU SPARC ENTERPRISE M8000 User Manual

Page 377

background image

Chapter 20

Backplane Replacement

20-21

13. Start (turn on power) all domains together. Take either of the following two

actions:

Press and hold down (for less than four seconds) the POWER switch on the
operator panel.

From a console that is connected to XSCF, execute the poweron -a command
of XSCF.

The power to all the domains is turned on, and then the power-on self test (POST)
is executed. When ok prompt displayed on the console of relevant domain, POST
is completed.

For details of the power-on operation, see

Section 4.4.2, “Powering the Server On”

on page 4-19

, and the SPARC Enterprise M3000/M4000/M5000/M8000/M9000

Servers XSCF User’s Guide.

14. Restore the original mode switch setting on the operator panel.

20.2.3

FAN BP

FIGURE 20-13

,

FIGURE 20-14

, and

FIGURE 20-15

show the mounting locations of FAN BPs

of M8000, M9000 (base cabinet), and M9000 (with the expansion cabinet),
respectively.