Step 11 – FUJITSU SPARC ENTERPRISE M8000 User Manual
Page 209
Chapter 7
I/O Unit (IOU) Replacement
7-15
Note –
In hot addition of an IOU, mount the CMU and IOU in the proper location.
Otherwise, the added IOU may not operate.
Caution –
Do not forcibly push the IOU when inserting it, even if it is not moving
smoothly. If the IOU is forcibly inserted despite the presence of any obstruction in a
slot or any problem with a connector pin, serious damage may result.
10. Go back to the terminal that is connected to XSCF, and perform the input
operation according to the instructions of the maintenance menu that is
displayed after the replacement.
a. Because the displayed messages are different between active replacement
and hot replacement, perform the operation according to the instructions for
each case. When the display of the maintenance menu returns to the initial
page, the operation is completed.
b. Exit the maintenance menu.
11. Configure the IOU into the system.
■
Active replacement:
Configure dynamically the IOU into a domain by using the addboard
command. Do this operation for all the domains that have been recognized in
as including the target CMU.
For details, see
Section 4.2.2, “Disconnecting and Replacing a FRU” on
, and the SPARC Enterprise M4000/M5000/M8000/M9000 Servers
Dynamic Reconfiguration (DR) User’s Guide.
■
Hot replacement:
From the console that is connected to XSCF, execute the poweron -d
command of XSCF to turn on power to the domain.
When the power to the domain is turned on, the power-on self test (POST) is
performed. When ok prompt displayed on the console of relevant domain,
POST is completed.