FUJITSU SPARC ENTERPRISE M8000 User Manual
Page 131

Chapter 4
FRU Removal Preparation
4-37
Note –
The SPARC Enterprise M8000 server comes with 22 short hook-and-loop
fasteners and 4 long hook-and-loop fasteners for cables. Use the type of
hook-and-loop fastener appropriate to the situation.
Note –
To do maintenance on the IOU or the FAN unit of the SPARC Enterprise
M8000 server, push aside the cables.
Caution –
Do not place any cable over a PCI cassette at the front of an IOU in the
SPARC Enterprise M8000 server. (Adjust the positioning to divide and bundle the
cables.)
Caution –
Take care to prevent the cables from blocking the ventilation slits of the
SPARC Enterprise M8000 server. (Fujitsu recommends running the cables above the
handle of the FAN unit.)
Caution –
Keep optical fiber cables as far apart from other cables as possible to
prevent the optical fiber cables from being covered by the other cables.
Caution –
Fasten the bundles of cables with the attached hook-and-loop fastener to
the SPARC Enterprise M8000 server, while avoiding the following locations which
may affect the system operation:
- The handle or the lever of the AC section
- The handle of the FAN unit
- The handle or the lever of the IOU
- The lever of the PCI cassette
Caution –
When bending a cable, keep its bending radius within the permissible
bending radius.
Caution –
Take sufficient care not to touch the main line switch when laying cables.