beautypg.com

Queue clearing – Rockwell Automation 193-EC1_2_3_5, 193-ECPM,592-EC1_2_3_5 E3 and E3 Plus Solid-State Overload Relay User Manual User Manual

Page 93

background image

Rockwell Automation Publication 193-UM002I-EN-P - December 2011

93

Protective Trip & Warning Functions Chapter 3

PM – Oper. Hours, Parameter 102, allows the installer to set a number of hours
of operation. It is adjustable from 0…65,565 hours.

The E3 Overload Relay will give a PM – Oper. Hours warning indication when:

• PM – Oper. Hours warning is enabled, and
• Elapsed Time parameter is equal to or greater than the value set in the PM

– Oper. Hours parameter.

Upon a PM – Oper. Hours warning, the:

• TRIP/WARN LED will flash an amber 15-blink pattern,
• bit 14 in Warning Status, Parameter 15, will set to “1”, and
• bit 1 in Device Status, Parameter 21, will set to “1”.

Queue Clearing

Using the Clear Queue, Parameter 104, the E3 Overload Relay provides the
capability to simultaneously clear/reset the:

• Trip Logs, Parameters 16…20,
• Warning Logs, Parameters 90…94,
• Starts Counter, Parameter 96, and the
• Elapsed Time Parameter 95.

If using the Preventative Maintenance Flags, the user will want to reset the Starts
Count and Elapsed Time after preventative maintenance has been performed.