beautypg.com

Installation & wiring, Introduction, Receiving – Rockwell Automation 193-EC1_2_3_5, 193-ECPM,592-EC1_2_3_5 E3 and E3 Plus Solid-State Overload Relay User Manual User Manual

Page 17: Unpacking/inspecting, Storing

background image

Rockwell Automation Publication 193-UM002I-EN-P - December 2011

17

Chapter

2

Installation & Wiring

Introduction

This chapter provides instructions for receiving, unpacking, inspecting, and
storing the E3 Overload Relay. Installation and wiring instructions for common
applications are also included.

Receiving

It is the responsibility of the user to thoroughly inspect the equipment before
accepting the shipment from the freight company. Check the item(s) received
against the purchase order. If any items are damaged, it is the responsibility of the
user not to accept delivery until the freight agent has noted the damage on the
freight bill. Should any concealed damage be found during unpacking, it is again
the responsibility of the user to notify the freight agent. The shipping container
must be left intact and the freight agent should be requested to make a visual
inspection of the equipment.

Unpacking/Inspecting

Remove all packing material from around the E3 Overload Relay. After
unpacking, check the item’s nameplate catalog number against the purchase
order.

Storing

The E3 Overload Relay should remain in its shipping container prior to
installation. If the equipment is not to be used for a period of time, it must be
stored according to the following instructions in order to maintain warranty
coverage:

• Store in a clean, dry location.
• Store within an ambient temperature range of -40 °C…+85 °C

(-40

°F…+185 °F).

• Store within a relative humidity range of 0…95%, non-condensing.
Do not store where the device could be exposed to a corrosive atmosphere.
Do not store in a construction area.