Rack mounting, How to use this ma, Port configuration – Interlogix GE-DSSG-244-POE User Manual User Manual
Page 27: Voice vlan configuration, Cable diagnostics, Stages of poweri
IFS NS3601-24P/4S GE-DSSG-244 and 244-POE User Manual
25
Step5:
Supply power to the Managed Switch.
Connect one end of the power cable to the Managed Switch.
Connect the power plug of the power cable to a standard wall outlet.
When the Managed Switch receives power, the Power LED should remain solid Green.
Rack Mounting
To install the Managed Switch in a 19-inch standard rack, please follows the instructions described below.
Step1:
Place the Managed Switch on a hard flat surface, with the front panel positioned towards the front side.
Step2:
Attach the rack-mount bracket to each side of the Managed Switch with supplied screws attached to the package.
Figure 2-8
shows how to attach brackets to one side of the Managed Switch.
Figure 2-8
Attach brackets to the Managed Switch.
You must use the screws supplied with the mounting brackets. Damage caused to the parts by
using incorrect screws would invalidate the warranty.
Step3:
Secure the brackets tightly.
Step4:
Follow the same steps to attach the second bracket to the opposite side.
Step5:
After the brackets are attached to the Managed Switch, use suitable screws to securely attach the brackets to the rack
, as
shown in
Figure 2-8
.