Install the switch, Desktop installation, Product description – Interlogix GE-DSSG-244-POE User Manual User Manual
Page 25: Port management, Dscp remarking, Remote ip ping test, The poe provision process
IFS NS3601-24P/4S GE-DSSG-244 and 244-POE User Manual
23
NS3601-24P/4S / GE-DSSG-244-POE Rear Panel
Figure 2-6
Rear panel of NS3601-24P/4SP and GE-DSSG-244-POE
■ AC Power Receptacle
For compatibility with electric service in most areas of the world, the Managed Switch’s power supply automatically adjusts to
line power in the range 100-240VAC and 50/60 Hz.
Plug the female end of the power cord firmly into the receptalbe on the rear panel of the Managed Switch. Plug the other end of
the power cord into an electric service outlet.
Power Notice:
1.
The device requires a power connection to operate. If your networks should active all the time,
please consider using UPS (Uninterrupted Power Supply) for your device. It will prevent you from
network data loss or network downtime.
2.
For additional protection against unregulated voltage or current surges, you may also want to
consider surge suppression as part of your installation.
Install the Switch
This section describes how to install your Managed Switch and make connections to the Managed Switch. Please read the following
topics and perform the procedures in the order being presented. To install your Managed Switch on a desktop or shelf, simply
complete the following steps.
Desktop Installation
To install the Managed Switch on desktop or shelf, please follows these steps:
Step1:
Attach the rubber feet to the recessed areas on the bottom of the Managed Switch.
Step2:
Place the Managed Switch on the desktop or the shelf near an AC power source, as shown in
Figure 2-7
.