beautypg.com

1 power on sequence, 2 power cutoff sequence – IAI America SSEL User Manual

Page 82

background image

60

Part 1 Installation

1.1 Power ON Sequence

x Although separate inputs are provided for the control power and motor power, they should be supplied from

the same power-supply terminal.

x Turn on the PIO power first. You can turn on the PIO power much earlier than the control power and motor

power, as long as it is turned on before the control power/motor power.

* If the PIO power is not turned on before the control power is turned on, an error will be detected.

1.2 Power Cutoff Sequence

x If the PIO power is turned off before the control power and motor power (before the power cutoff processing

is performed), a PIO power error may be logged internally by the controller.

x The PIO power can be turned off much later than the control power and motor power, as long as it is turned

off after the control power/motor power.

Taken from the
same power supply.

Control power

Motor power

Controller status

Must be turned
on first, as a
rule.

PIO power

The PIO power must be turned
on before the control power, in
order to perform checks during
initialization and self-diagnosis
and apply a hardware latch
upon detection of an error.

Must be turned on
simultaneously, as a rule.

Initialization/self-diagnosis

Normal operating condition

Control power

Motor power

Controller status

PIO power

After the power is cut off,
the power cutoff processing
will start within approx. 0.5
to 1.5 AC cycles.

Must be turned off
simultaneously, as a rule.

Power cutoff processing

If the PIO power is
turned off during
this period, an error
may be logged
internally by the
controller.

0.5 to 1.5 AC

cycles

Brake power

Brake power must be
supplied before the
controller enters the
normal operation
mode.