9 replacing the headspace sampling system needle – INFICON HAPSITE Smart Plus Chemical Identification System User Manual
Page 545
16 - 47
IP
N 07
4-
47
2-
P1
C
HAPSITE Smart Plus Operating Manual
18
Tighten the three securing screws with the screw driver. Tighten them
alternately and gently to ensure that the Ionizer is installed straight.
NOTE: As you install and tighten the Ionizer, make sure the extension tube
remains positioned in the ion volume and is lined up with the
membrane isolation valve.
19
With the forked end of the Ionizer removal tool, grab the extension tube and
slide it into the membrane isolation valve so that it is not protruding into the ion
volume.
20
Install a new NEG Pump or reinstall the old NEG Pump with a new aluminum
sealing ring. Perform the activation process or put the blank off flange with
o-ring on the manifold.
NOTE: See
section 16.7.4, Part 3: Install the New NEG Pump, on page 16-29
through
section 16.7.6, Part 5: Activation of the NEG Pump, on page
for detailed information regarding NEG Pump installation.
16.9 Replacing the Headspace Sampling System Needle
Replacement of the needle in the needle assembly should be performed on an as
needed basis. The needle will need to be replaced if it is significantly deformed, if
it is broken, if the point becomes blunted, or if the holes become plugged with
debris.
Tools Required
A No. 2 Phillips screwdriver.
1/4" open end wrench or equivalent.
WARNING
The needle tips are sharp. Be careful to avoid injury.
WARNING
Be careful to avoid burns if the surfaces are still hot.
Procedure
1
Open the top yellow cover of the HSS to expose the needle assembly.
2
Using the Phillips screwdriver, loosen and remove the two screws on top of the
assembly.
3
Remove the top cover of the needle assembly to expose the needle and the
1/4" connection fittings.