beautypg.com

6 interviews, 7 data collected during the site visit – Retrotec USACE User Manual

Page 65

background image

Chapter 5 43

meters; infrared surface temperature sensors; illuminance meter for lighting
level measurements).

Other equipment needed by the energy auditor includes a fl ashlight, smoke

gun, measuring tape, ultrasonic distance meters, safety glasses, ear plugs,
gloves, and a digital photo camera.

5.7.6 Interviews

The energy assessment team should discuss with the site staff at the kick-off
meeting to what extent the building occupants will be interviewed during the
site visit. If there are major indoor air quality problems or other similar dif-
fi culties in the buildings, the interviews will probably not bring any special
information on energy use, but only concentrate on the problems that the as-
sessment team may not have enough reliable background or historical informa-
tion about.

If, however, there are no major problems, a quick interview on occupant

behavior and energy-using routines is usually very useful and brings up ideas
for saving measures.

5.7.7 Data Collected during the Site Visit

From interviews with the building’s occupants and a visual survey of obvious de-
fects in mechanical systems, answers to the following questions can be obtained:

Are there any problems with humidity and the building envelope in the

winter?
Are there problems with freezing through the building envelope?

What is the air leakage through windows and doors? Are there related

problems with drafts?
Are there problems with heating, cooling, or water supply systems or

power supply?
How do the controls of mechanical systems work, and what is their

technical condition?
Are there rooms that are overheated or underheated? Are there areas

that are too hot and need cooling? Are there unnecessarily air-condi-
tioned spaces or areas that are too cold?
Is the water pressure in the water supply system adequate?

Is there urgent need in repair of mechanical systems and their elements?

Is the lighting suitable for the activity in the building? What is the type

and age of the lighting fi xtures? Are there problems related to lighting?