B1

Appendix B

Examples of Level I Assessment Summary Table

ECM

Description

Investment

(K$)

Savings

(K$/yr)

Payback

(yr)

Savings

Category

Recommended

Funding

Sources

PL#1A, Ph 1
only

Install and test two EED on chrome plat-
ing tanks

153.5

33.6

4.57

E, M

ECIP

PL#1, Ph1 & 2

Install EED on all chrome plating tanks

984.8

251.7

3.91

E, M (S&H)

ECIP

PL#2

Control airfl ows and steam heating

212

82.9

2.56

E

ECIP

PL#3

Insulate hot plating tanks and rinse tanks

101

9.6

10.53

E

ECIP

PL#5

Allow hot plating and rinse tanks to cool
down

2.5

5.2

0.48

E

ECIP

PL#6

Retrofi t MAUs with low pressure drop
fi lters

85

8.1

10.40

E, M

ECIP

PN#1

Enclose Drive-Through Paint Booth #1 in
Bldg. 208

79.8

21.0

3.79

E (P)

ECIP

PN#2

Enclose Drive-Through Paint Booth #2 in
Bldg. 208

132.4

21.3

6.23

E (P)

ECIP

PN#3

B299 Paint Booth 4 improvements

145.9

114.7

1.27

E (P)

ECIP

PN#4

B229 Paint Booth 5 improvements

49.7

63.1

0.79

E (P)

ECIP

HT#5

Heat treat ventilation improvements

168.6

4.6

36.6

E (IAQ)

ESPC

FD#2

Improve foundry ventilation

TBD

TBD

TBD

E (S&H)

ESPC

WD#1

Install ergonomic extraction arms

121.6

9.2

13.24

E (IAQ,P)

ECIP

WD#2

Install improved ventilation system

15.9

35.5

0.45

E (IAQ,P)

ECIP

BE#1

Improve B-220 working conditions and
IAQ

273.2

61.6

4.43

E (TC)

ECIP

BE#2

Install high-speed doors where necessary

64

43.1

1.48

E (TC)

ECIP

BH#1

Improve ventilation in Rapid Response
Mnfc. Cell

17.4

high

quick

E

O&M

BH#6

Install on/off dampers in B-220 supply
air ducts

6

2.5

2.4

E

O&M

BH#8

Improve IAQ in B-299 manufacturing
departments

low

high

quick

E (IAQ)

O&M

BH#9

Perform further energy savings measures
in B-222

2.5

2.2

1.19

E

ECIP

LT#1

Install task lamps in areas requiring ad-
ditional lighting

72.1

58.9

1.22

E (P)

ECIP

FD#1

Replace critical foundry equipment in
B-212 W

744.1

354

2.1

P

WC

18 ECMs

Total of the economically quantifi ed
ECMs, including PL#1 Phase 2 work

3261.1

1149.2

2.84

ALL

ALL

TABLE B1. EXAMPLE LEVEL I ASSESSMENT SUMMARY TABLE

(Continued)