F20 ENERGY & PROCESS ASSESSMENT PROTOCOL
Step
Description
Result
1
Enclosure Area: Record the total exterior enclosure surface area including walls, fl oor
and ceiling from design plans as supplied by the Architect of Record (AOR). Verify the
dimensions used by the AOR in the calculations match as-built conditions and that the
arithmetic was performed correctly.
m
2
(sq ft)
NOTE: Testing agency to attach a description of the building characteristics, including intended use, wall, roof, and fl oor construction, fenestrations, HVAC system, air
barrier system, and any additional information that may be relevant to the air leakage test.
2
Set Up Checklist
2.1
Confi rm HVAC shutdown/disabling.
2.2
Confi rm all dampers in the enclosure
perimeter are closed and/or isolated.
2.3
Confi rm exhaust fans & dryers are off
and isolated at the enclosure level.
2.4
Confi rm combustion appliances are
on pilot or are disabled.
2.5
Confi rm all air inlets at the enclosure
perimeter are sealed or isolated.
2.6
Confi rm all interior doors are
propped open.
2.7
Confi rm all air outlets at the
enclosure perimeter are sealed or
isolated.
2.8
Note rain or snow conditions that
may be affecting leakage of walls.
2.9
Confi rm exterior doors and windows
are closed and latched.
2.10
Confi rm ambient conditions provided
are outside of air barrier envelope.
2.11
Confi rm all plumbing traps are fi lled
with water.
2.12
Confi rm dropped ceiling tiles are
removed at specifi ed rate.
2.14
Confi rm uniform interior pressure distribution by establishing at least 30 Pa and using a minimum of four
pressure monitoring stations with one common exterior pressure monitoring station. Measure pressures at the
four interior stations to ensure the interior pressure is within +/– 10% of target value. List interior stations
and pressures measured:
Interior Station Locations:
______________________________________
_____________________________________________
______________________________________
_____________________________________________
Pressure: ___ Pa ___ Pa ___ Pa ___ Pa
2.15
Describer the approximate locations of the exterior pressure monitoring stations and whether the stations will
be manually averaged or a manifold used.
Exterior Station Locations:
______________________________________
_____________________________________________
______________________________________
_____________________________________________
Means of averaging:_______________________________________________________________