beautypg.com

Control power checks (no medium voltage) – Rockwell Automation 7000 PowerFlex Medium Voltage AC Drive (B Frame) - ForGe Control (PanelView 550) User Manual

Page 179

background image

Rockwell Automation Publication 7000-UM151E-EN-P - January 2013

179

Component Definition and Maintenance Chapter 3

– This includes main cooling fan, power devices, heatsinks, circuit boards,

insulators, cables, capacitors, resistors, current transformers, potential
transformers, fuses, wiring, etc.; Causes could be corrosion, excessive
temperature, or contamination.

– Verify that torque on heatsink bolts (electrical connections to bullet

assemblies) is within specifications (13.5 N-m).

– Clean all contaminated components using a vacuum cleaner (DO NOT

use a blower), and wipe clean components where appropriate.

– NOTE: An important component to check for contamination is the

heatsink. The fine grooves in the aluminum heatsinks can capture dust
and debris.

• Carry out the physical inspection and verification for the proper operation

of the contactor/isolator interlocks, and door interlocks.
– Carry out the physical inspection and verification for the proper

operation of the key interlocks.

– Physical verification of the additional cooling fans mounted in the AC

Line Reactor cabinet, Harmonic Filter cabinet for mounting and
connections.

– Carry out the cleaning of the fans and ensure that the ventilation

passages are not blocked and the impellers are freely rotating without
any obstruction.

– Carry out the insulation meggering of the drive, motor, isolation

transformer/line reactor, and the associated cabling.

– Refer to User Manual, Appendix D – Meggering, for meggering

procedure.

– Check clamp head indicator washers for proper clamp pressure, and

adjust as necessary.

– Refer to User Manual, Chapter 5 – Component Definition and

Maintenance for details on proper clamp pressure.

Control Power Checks (No Medium Voltage)

• Apply 3 Phase Control power to the PF7000 drive, and test power to all of

the vacuum contactors (input, output, and bypass) in the system, verifying
all contactors can close and seal in.
– Refer to Publication 1502-UM050_-EN-P for a detailed description of

all contactor maintenance

• Verify all single-phase cooling fans for operation.

– This includes the cooling fans in the AC/DC Power supplies and the

DC/DC converter.

• Verify the proper voltage levels at the CPT (if installed), AC/DC Power

Supplies, DC/DC converter, isolated gate power supply boards.
– Refer to the Commissioning Guide for appropriate procedures/voltage

levels for the above checks.

• Verify the proper gate pulse patterns using Gate Test Operating Mode.