JLG X23J - X700AJ Service Manual User Manual
Page 71

SECTION 3 - CHASSIS & TURNTABLE
3-44
– JLG Lift –
3121448
31. Connect P1 and P2 ports to an hydraulic power unit
with 10 l/min oil flow and run the motor unloaded.
Figure 3-115.
INFORMATION
WHILE THE MOTOR IS RUNNING UNLOADED, COM-
P L E T E T H E T I G H T E N I N G O F T H E H E X A G O N A L
HEAD SCREWS M8 (43), GRADE 10.9 FOLLOWING THE
INDICATED ORDER.
Figure 3-116.
32. Tighten the screw (43) by a torque wrench, at 38 Nm
torque.
Figure 3-117.
REASSEMBLY OF THE GEARBOX
1. Place the bearing (10) inside the gearbox housing
(9).
Figure 3-118.
This manual is related to the following products: