JLG X23J - X700AJ Service Manual User Manual
Page 328

SECTION 3 - CHASSIS & TURNTABLE
3121448
– JLG Lift –
3-301
FITTINGS
Preliminary work:
– Disconnect the battery: first the nega tive pole, then the
positive pole.
Dismantling:
– Take out machine screws 1 with washer 2.
– Detach cables and take off the electrical fitting.
Testing / repair:
– Examine parts for damage and renew if necessary.
Assembly:
– Following the dismantling procedure in the reverse
order.
– Make sure that the cables are reconnected correctly.
This manual is related to the following products: