Installation load cell, Removing footswitch, Installation footswitch – JLG X23J - X700AJ Service Manual User Manual
Page 424

SECTION 4 - BOOM & PLATFORM
3121448
– JLG Lift –
4-25
4.7 LOAD CELL AND FOOTSWITCH
REMOVAL/INSTALLATION
Removal load cell
1. Turn the machine off and unplugged from the power
supply.
2. Remove the basket of the
machine (see dismantling basket).
3. Remove screws (2) and remove cover (3).
4. Remove the load cell (4) by disconnecting
the wiring from ECM3.
Installation load cell
1. Install the load cell (4) and stop with cover (3) and
secure with screws (2).
2. Remount the load cell (4) connecting the electrical
wiring to ECM3.
3. Reinstall the
basket. (See section basket installation)
Figure 4-38.
Removing footswitch
1. Turn the machine off and unplugged from the power
supply.
2. Remove the basket of the machine. (See
paragraph basket removal).
3. Remove screws (5) securing support footswitch (6).
4. Loosen the fixing screw foot (1).
5. Remove the footswitch (1) disconnecting
the wiring from ECM3.
Installation footswitch
1. Fit and secure with screw the the footswitch (1) to
the support footswitch (6).
2. Secure with screws (5) footswitch support (6) to
the basket support(7).
3. Connect the wiring to ECM3.
4. Reinstall the basket. (See
paragraph basket installation).