JLG X23J - X700AJ Service Manual User Manual
Page 124

SECTION 3 - CHASSIS & TURNTABLE
3121448
– JLG Lift –
3-97
3.7 DRIVE HUB - EATON
TR* series Orbit Motor Maintenance
Manual
INTRODUCTION
This manual shows the way of disassembly and reassem-
bly of TR* series ORBIT MOTOR . Please see the attached
papers,
Assembly drawing: TRCV49C2204-A (AZ7663B)
Tools required for disassembly and
reassembly
Disassembly
Cleanliness is extremely important when repairing a
hydraulic motor. Work in a clean area.
Before disconnecting the lines, clean the port area of the
motor thoroughly.
Use a wire brush to remove foreign material and debris
from around the exterior joints of the motor.
Note: Don’t disassembly the following
Parts if not necessary.
Spindle/wheel ass’y, Endcover ass’y
Place the motor in a vise with the Geroler part.
Clamp across the Endcover ass’y.
Remove the bolt (27) from the motor.
TYPE
SPEED
MACHINE
MOTOR
EATON
2V
X14JH
X17J -X500AJ
X14J-X390AJ
X19J-X550AJ
Tool name
Information
Torque wrench
Capacity 9.8~98Nm
Hexagon socket
6 mm
8 mm
Loctite
#242
Eyebolt
M8
Screw driver