5 pressure setting procedure, Control valve left side (chassis functions), Control valve right side (chassis functions) – JLG X23J - X700AJ Service Manual User Manual
Page 462

SECTION 5 - HYDRAULICS
5-36
– JLG Lift –
3121448
5.5 PRESSURE SETTING PROCEDURE
Cold temperatures have a significant impact on pressure
readings. JLG Industries Inc. recommends operating the
machine until the hydraulic system has warmed to normal
operating temperatures prior to checking pressures. JLG
Industries Inc. also recommends the use of a calibrated
gauge. Pressure readings are acceptable if they are within
± 5% of specified pressures.
Control Valve Left Side (Chassis functions)
1. Machine completely closed.
Figure 5-104.
2. Install the pressure gauge at the port marked MA
Figure xx.
3. Activate the function outrigger IN on remote control.
4. Verify that the pressure is as on Table below.
To adjust the relief valve, turn clockwise to increase, turn
counterclockwise to decrease the pressure.
Control Valve Right Side (Chassis
functions)
1. Install the pressure gauge at the port marked MB
Figure xx.
2. Activate the function outrigger IN on remote control.
3. Verify that the pressure is as on Table below.
To adjust the relief valve, turn clockwise to increase, turn
counterclockwise to decrease the pressure.
Control Valve Left Side (Chassis functions)
Model Pressure
Port
Function
Outrigger IN
Pressure setting
Outrigger N°
Bar
PSI
X23J
X700AJ
MA
3; 4
160
2320
X17J
1; 2
165
2400
X14JH
Stab. SX
175
2540
X19J
X550AJ
3; 4
165
2400
X14J
X390AJ
4; 2
0,2
A
3,23,2
B B
B B
APPOGGIO_POST
Control Valve Right Side (Chassis Functions)
Model Pressure
Port
Function
Outrigger IN
Pressure setting
Outrigger N°
Bar
PSI
X23J-
X700AJ
MB
1; 2
160
2320
X17J
3; 4
165
2400
X14JH
Stab. DX
175
2540
X19J-
X550AJ
1;2
165
2400
X14J-
X390AJ
1; 3