HEIDENHAIN TNC 306 Technical Manual User Manual
Page 104

4-4
TNC 406/TNC 306
3/97
Commissioning and start-up procedure
15.1 Code numbers for commissioning
15.2 Preparation of the machine
15.3 Commissioning the control
15.3.1 Entry of the provisional and pre-defined machine parameters
15.3.2 Entry of the PLC-program
15.3.3 Testing the EMERGENCY STOP routine
15.3.4 Testing the direction of traverse
15.3.5 Setting the software limit switch ranges
15.3.6 Optimizing control with servo lag
This manual is related to the following products: