I-7 commissioning 29, I-7 commissioning – West Control Solutions KS98-1 User Manual
Page 29
I-7
Commissioning
Before switching on the instrument, ensure that the following points are taken into account:
w
The supply voltage must correspond to the specification on the type label!
w
All covers required for contact protection must be fitted.
w
Before operation start, check that other equipment in the same signal loop is not affected. If necessary, appropri -
ate measures must be taken.
w
The unit is freely configurable. For this reason, the input and output behaviour is determined by the loaded engi -
neering. Before commissioning, make sure that the right instructions for system and instrument commissioning
are available.
Unless an application-specific engineering was loaded, the unit is equipped with the IO test engineering described on
page 49.
a
Before instrument switch-on, the plant-specific input and output signal types must be adjusted on the in -
strument, in order to avoid damage to the plant and to the device.
On instruments without default setting, partial I/O signal testing is possible.
a
The effect on connected equipment must be taken into account.
After supply voltage switch-on, start-up logo and
Main menu wait! are displayed, followed by display of the main
menu during several seconds .
Unless a selection is made during this time, the first operating page (e.g. a controller) is displayed automatically, wit -
hout marking a line or a field.
9499-040-82711
Commissioning
Connecting diagram i/o-modules
I-29