beautypg.com

I-5 mounting 20, Mounting 20 - 22, I-5 mounting – West Control Solutions KS98-1 User Manual

Page 20: Culus certification

background image

I-5

Mounting

The instrument must be installed as described below. Required dimensions of the control cabinet cut-out and minimum
clearances for installation of further units are shown in the drawing.

For mounting, insert the unit into the control cabinet or cabinet door cut-out. Push the instrument module fully home
and mount it firmly by means of the locking screw. Four fixing clamps are delivered with the unit.

Ü

These clamps have to be fitted in the instrument
from the control cabinet inside: 2 at top and bot-
tom.

*

Now, the threaded pins of the fixing clamps can
be screwed against the control cabinet from insi-
de.

!

A rubber seal is fitted on the rear of the instrument front panel (in mounting direction).
This rubber seal must be in perfect condition, flush and cover the cut-out edges completely to ensure tightness!

cULus certification

+

For compliance with cUus certificate, the technical data at the beginning must be taken into account (see technical
data, page 12 .

Mounting

9499-040-82711

I-20

Auxiliary equipment

96

96

92

+0,8

92

?

24

+0,8

1...16

min.

0°C

60°C

max.

max.

95% rel.

KS 98-1 advanced

1

2

3

4

KS 98-1 advanced

1

2

3

4

KS 98-1 advanced

1

2

3

4

96

96

160

l

Fig. 4 Mounting

¡

Ü

Fig. 5 Inserting the locking screws