Scheduled Rebuild/Migrates.

You can enable or disable the schedule for the

Rebuild/Migrate tasks by selecting either

Follow Schedule

or

Ignore

Schedule

. When schedules are set to be ignored, these tasks can be

performed at any time, and are not restricted to the scheduled times.

Scheduled Verify Mode.

You can select either

Basic

or

Advanced

verify

mode. Basic verify creates a once a week schedule. Advanced verify has
seven scheduling slots per week, similar to the Rebuild/Migrate schedule. For
more information, see “Selecting Advanced or Basic Verify Schedules” on
page 166.

Task Schedules

Initially, 7 schedule slots are defined, for 24 hours each. This means that even
if

Follow Schedule

is enabled for Rebuild/Migrate or if

Advanced

is

selected for Auto-Verify, this schedule is equivalent to

Ignore Schedule

,

because tasks can run at any time, round the clock.

A maximum of 7 slots can be created, so to set a different schedule, start by
deleting one or more of the existing scheduled slots, and then add new slots.