HEIDENHAIN CNC Pilot 4290 V7.1 User Manual
Page 544

544
6.15 A
u
to
matic W
o
rk
ing Plan Gener
a
tion (A
WG)
Machining sequence for drilling
Main machining
Submachining
Location
Execution
Drilling
Contour analysis: Determining the “Hole” form elements.
Sequence – Drilling operations/drilling combinations:
Centering / Centering and countersinking
Drilling
Countersinking / Drilling and countersinking
Reaming / Drilling with reaming
Tapping / Drilling with thread
Sequence – Location:
Centric
Front (also machines Y front)
Lateral surface (also machines Y surface)
– then the elements are machined according to the sequence of
geometrical definition
–
–
Machining all bore holes on all machining locations
Centering, drilling,
countersinking,
reaming, tapping
(*)
–
Execution of the selected drilling operation on all machining
locations
Centering, drilling,
countersinking,
reaming, tapping
(*)
Location
Machining a bore hole on the selected machining location
*: Define the drilling cycle
Drilling combinations:
Define the drilling combinations as machining attributes
(see “Machining attributes – Drilling combinations” on
page 475).
Select the appropriate drilling operation as
submachining operation (see above).