13 preparing a machining process, Preparing a machining process – fundamentals – HEIDENHAIN CNC Pilot 4290 V7.1 User Manual
Page 482

482
6.13 Pr
epar
ing a Mac
h
ining Pr
ocess
6.13 Preparing a Machining Process
Preparing a machining process – Fundamentals
The “Prepare” function defines the chucking equipment, the position
of the chucking equipment, and TURN PLUS specific turret
assignments.
For chucking a workpiece, TURN PLUS determines the following data:
Inside and outside cutting limit.
Zero point shift. The value is transferred to the NC program as a G59
command.
TURN PLUS transfers the following set-up information to the program
head:
Clamping diameter
Free length
Clamping pressure
You can set/change the cutting limits.
If you do not use “clamp” TURN PLUS assumes
standard values.
You define the chucking equipment for the second
setup after machining the first setup.
If you clamp the workpiece at the spindle and the
tailstock, TURN PLUS assumes that a shaft is
machined (see “Shaft machining” on page 557).
- TNC 122 User Manual (63 pages)
- TNC 122 Technical Manual (70 pages)
- TNC 360 Service Manual (157 pages)
- TNC 416 Technical Manual (510 pages)
- TNC 335 Technical Manual (581 pages)
- TNC 360 User Manual (237 pages)
- TNC 360 ISO-Programmierung (2 pages)
- TNC 415 (280 540) User Manual (227 pages)
- TNC 370D (92 pages)
- TNC 416 (289 pages)
- TNC 415 (280 540) Technical Manual (752 pages)
- TNC 415 (259 96x) Service Manual (195 pages)
- TNC 407 (280 580) User Manual (376 pages)
- iTNC 530 (340 420) Pilot (104 pages)
- TNC 407 (280 580) ISO Programming (333 pages)
- TNC 415 (280 540) Service Manual (252 pages)
- PT 880 Installation (112 pages)
- ND 100 User Manual (116 pages)
- ND 287 User Manual (147 pages)
- ND 280 Quick Start (12 pages)
- ND 200 (156 pages)
- ND 282 (10 pages)
- ND 287 Quick Start (26 pages)
- ND 282 B (39 pages)
- ND 281 A (44 pages)
- ND 281 B v.1 (53 pages)
- ND 281 B v.2 (65 pages)
- ND 221 v.2 (10 pages)
- ND 231 B v.2 (56 pages)
- ND 231 B v.1 (44 pages)
- ND 221 B v.2 (45 pages)
- ND 550 v.2 (8 pages)
- NDP 560 (10 pages)
- ND 523 (93 pages)
- ND 570 (8 pages)
- ND 750 v.2 (46 pages)
- ND 760 v.3 (72 pages)
- ND 770 v.1 (40 pages)
- ND 770 v.3 (41 pages)
- ND 760 E (44 pages)
- IOB 49 (21 pages)
- NDP 960 (68 pages)
- ND 780 Installation (132 pages)
- ND 970 (47 pages)
- ND 1100 Quick Start (36 pages)