Creating and Starting a Test Case

SONET/SDH Application

69

Typical Test Cases

4. Select the test

path/mapping (For DS3,
E4, E3, and E2).

4a. From the data path

selector, press the
desired mapping
then press the
timeslot from the
Grid tab. Choices
depend on the
selected interface.
See Supported
Paths/Mappings
on
page 59 for more infor
mation.

4b. Select the Framing. For more

information, refer to DSn Tabs on
page 269
or PDH Tabs on page 369.

4c. For DS1, select the Enable FDL check

box to allow facility data link testing. For
Dual RX test, FDL is only available for the primary DS1 TX/RX port.

4d. For DS1/E1, select the Enable DS0/E0 check box to allow DS0 or

E0 testing.

4e. For Pattern, go to step 5.

4f. Press Next or Finish.

4g. Repeat step 4 as required to complete the path/mapping. See

Supported Paths/Mappings on page 59 for more information.

5. Pattern Configuration:

5a. Set the pattern parameters. Refer to Pattern TX

on page 405 and Pattern RX on page 409 for
more information.