Creating and Starting a Test Case

SONET/SDH Application

63

Introducing the Test Setup

³

Test Setup Controls:

³

Back returns to the previous configuration step allowing to see,
change or delete what had been selected.

³

Next switches to the next configuration step. The Next button is
only available when selection(s) from the Data Path Selector
and/or the Grid tab has been made.

³

Delete deletes the current path node.

³

Finish/Setup:

Finish completes the configuration and creates the test case.
Default parameters will be used for the remaining wizard steps.
Thus, pressing Finish will automatically add a pattern at the end of
the test case structure if not already selected.

Setup is displayed instead of Finish once the test is created
allowing to return in setup mode. Setup is not available when the
test is started (running).

The test path is created through the configuration of each layer that must
be crossed by the signal under test. The test path contains the following
nodes:

For example:

Test

Connector

Signal

Payload/Traffic

Normal -

Coupled

Optical

OC-192, Normal, STS-1

Timeslot 1, VT1.5 Timeslot 1,

DS1

Pattern